Start here: no background needed
Words you need
| Word | Plain meaning | Bakery example |
|---|---|---|
| Demand | How much customers want | Customers want 300 loaves on Friday |
| Forecast | Your guess of future demand | "Next Friday we expect 310" |
| Actual | What really happened | We really sold 320 |
| Error | Actual − forecast | 320 − 310 = 10 loaves off |
| Capacity | The most you can make | The oven can bake 100 loaves a day |
| Utilisation | How much of the full capacity you used | Baked 64 of 100 = 64% |
| Efficiency | How much of the realistic capacity you used | Baked 64 of a realistic 80 = 80% |
| Fixed cost | Cost that stays the same however much you make | Shop rent |
| Variable cost | Cost for each unit you make | Flour for one loaf |
| Break-even | Units to sell before you stop losing money | Sell 10,000 loaves to cover rent |
| Inventory | Stock kept for later | Frozen dough in the freezer |
| Holding cost | Cost of keeping stock | Freezer electricity |
| Aggregate plan | Month-by-month plan for workers and output (3 to 18 months) | How many bakers for each month of the year |
| Level plan | Make the same amount every month | Bake 250 a day all year, freeze the extra |
| Chase plan | Make exactly what is demanded; hire or lay off | Hire extra bakers for Ramadan |
| Scheduling | Deciding which job goes first | Wedding cake before birthday cake? |
| Flow time | When a job is finished, counted from now | Cake ready 7 hours from now |
| Tardiness | How late a job is (0 if on time) | Due at 5 h, ready at 7 h = 2 h late |
| Bottleneck | The slowest step, which limits everything | One slow oven holds up four fast mixers |
Maths symbols you will see
| Symbol | Read it as |
|---|---|
| Σ | "add them all up". Σy = add every demand number |
| n | how many periods (days, months) there are |
| x | the period number: day 1, 2, 3… |
| y | the demand in that period |
| x̄, ȳ | the average of x, the average of y |
| A, F | A = actual, F = forecast |
| α | "alpha": a number between 0 and 1 that sets how much the newest month counts |
| |e| | the error with its minus sign removed (|−5| = 5) |
| ⌈ ⌉ | round up to the next whole number (64.3 → 65) |
Question bank → topic → CLO → tab
| Bank question | What it asks | Module | CLO | Learn it in |
|---|---|---|---|---|
| MCQ 1 to 6 | OM objective, functions, evolution, strategy, productivity, transformation | I | CLO1 | Foundations |
| Blanks 1 to 3 | Forecasting: demand · judgement · cyclical / random | II | CLO2 | Forecasting |
| Blanks 4 to 6 | Aggregate planning: capacity · subcontracting · cost | III | CLO3 | Aggregate planning |
| True/false 1 to 3 | Scheduling traps: F · T · T | III | CLO3 | Scheduling |
| Descriptive Q1 to Q3 | 5-mark cases: factory, hospital, defects | I | CLO1 | Written answers |
| Numerical Q2 | Least squares line (newspaper / water) | II | CLO2 | Forecasting |
| Numerical Q3 | Chase hiring and layoff cost (Al Saleem / NPI) | III | CLO3 | Aggregate planning |
| Numerical Q4 | Blank in the bank. Likely forecast errors or capacity | II | CLO2 | Forecasting, Capacity |
| Numerical Q5 (a) | Johnson's rule, two machines | III | CLO3 | Scheduling |
| Numerical Q5 (b) | EDD / SPT mean flow time and tardiness | III | CLO3 | Scheduling |
Mapped from Question Bank 1 MT and the HUM 4404 teaching plan (midterm = Modules 1 to 3, CLO1 to CLO3).
What's on the midterm
Topics by likelihood
| Topic | Likelihood | Tab |
|---|---|---|
| Least squares · chase cost · Johnson · EDD/SPT | Certain | Forecasting, Aggregate, Scheduling |
| MCQ, blanks, true/false, case essay | Certain | Foundations, Written answers |
| Forecast errors (MAD, MSE, MAPE) · moving average · smoothing | Very likely | Forecasting |
| Utilisation, efficiency, break-even, make or buy | Very likely | Capacity |
| Level vs mixed vs chase cost | Very likely | Aggregate |
| PPC, capacity factors, planning options | Likely (theory) | Foundations, Capacity |
| Trend smoothing, seasonal index, tracking signal | Possible | Forecasting |
| TOC, supply chain, TQM, lean | Not on midterm | Skip |
Rough split of the 30 marks
An estimate from the bank layout and the teaching plan; it isn't published anywhere.
Study plan: Monday afternoon to Tuesday noon
Exam Tuesday 2 PM. Study stops at 12 noon Tuesday. Short breaks between blocks.
| When | Do | Done when |
|---|---|---|
| Mon 1:30 to 4 | What's coming → Foundations → Forecasting (least squares, moving average, smoothing) | Formulas for b, a, F(t) from memory |
| Mon 4:30 to 7 | Forecast errors (port table) → Capacity | MAD 10.31 · break-even 10,000 |
| Mon 8 to 10:30 | Aggregate planning → Scheduling | Al Saleem $27,400 · Johnson 180 min |
| Mon 10:30 to 11:30 | Written answers + one pass of recall drills, then sleep | Most cards without flipping |
| Tue 7 to 8 | Mock under 60 min | Paper finished |
| Tue 8 to 10:30 | Mark the mock, redo wrong numericals, ask Claude to quiz weak spots, recall drills again | Weak topics fixed |
| Tue 10:30 to 12 | Cheat sheet · one of each numerical · stop at noon | Every recipe clean |
| Tue 12 to 2 | Eat, rest, reach the hall early. No new topics | Seated by 1:50 |
In the exam hour
Foundations
OM jobs (right answers)
Production planning & controlCapacityLayoutQualityInventorySchedulingMaintenanceSupply chain
Not OM (MCQ traps)
AdvertisingTax collectionPublic relationsRecruitment only
How OM evolved
- Craft
- Industrial revolution
- Taylor: time study
- Ford: assembly line
- Toyota: TQM, JIT, lean
- Now: automation, data, Industry 4.0
PPC: the planning ladder (links the whole midterm)
PPC stages: plan → operate → control (feedback against plan).
Productivity
Operations strategy
Align operations with business goals. Compete on:
CostQualityDeliveryFlexibility
| Goods | Services | |
|---|---|---|
| Tangible? | Yes | No |
| Can store? | Yes, inventory | No, made and used at once |
| Customer involved? | Rarely | Often |
How much you get out for what you put in. A baker makes 1,200 loaves in 300 hours.
Productivity = Output ÷ Input- Output = what was made: 1,200 loaves
- Input = what was used: 300 hours
- Divide: 1,200 ÷ 300 = 4 loaves per hour
Forecasting
Which method?
Four patterns inside demand data
Least squares: fit a straight line
Draw the best straight line through past demand, then extend it to guess the future. Line: y = a + bx, where b = growth per day and a = starting level.
b = (n×Σxy − Σx×Σy) ÷ (n×Σx² − (Σx)²) a = ȳ − b×x̄- Make a table: x (day 1 to 7), y (demand), x×y, x². Add each column.
- For 7 days these never change: n = 7, Σx = 28, Σx² = 140, x̄ = 4, so the bottom line is always 7×140 − 28² = 196
- Newspaper: Σy = 1,648, Σxy = 7,798 → b = (7×7,798 − 28×1,648) ÷ 196 = 43.07
- ȳ = 1,648 ÷ 7 = 235.43 → a = 235.43 − 43.07×4 = 63.14
- Answer: y = 63.14 + 43.07x. Day 8 forecast: put x = 8 → 407.7
Worked: both bank questions
Moving averages lag behind a trend
| Method | Formula | Use when |
|---|---|---|
| Naive | next = last actual | quick baseline |
| Moving average | Σ last n ÷ n | no trend |
| Weighted MA | Σ (w × A) ÷ Σ w | recent data matters more |
Forecast = average of the last few actual values. A 3-month average uses the last 3.
Next forecast = (sum of last n actuals) ÷ n- Pick the last n actuals, e.g. 120, 132, 128
- Add them: 380
- Divide by n: 380 ÷ 3 = 126.67
- Weighted: multiply each by its weight, add, divide by the total of the weights
Worked: shed sales
Exponential smoothing: α sets the reaction speed
New forecast = old forecast, nudged towards what really happened. α decides the size of the nudge.
New forecast = Old forecast + α × (Actual − Old forecast)- Old forecast 142, actual 153, α = 0.2
- Miss = 153 − 142 = 11
- Nudge = 0.2 × 11 = 2.2
- New forecast = 142 + 2.2 = 144.2
Forecast errors: smaller wins
| Measure | Formula | Tells you |
|---|---|---|
| MAD | Σ|A − F| ÷ n | average miss, in units |
| MSE | Σ(A − F)² ÷ n | punishes big misses |
| RMSE | √MSE | MSE back in units |
| MAPE | Σ(100|A − F| ÷ A) ÷ n | average miss as % |
Worked: Port of Baltimore error tables
They all measure how wrong a forecast was. The method with the smaller number is better.
Error = Actual − Forecast · MAD = average of |error| · MSE = average of error² · MAPE = average of (|error| ÷ actual × 100)- For every period: error = actual − forecast
- MAD: drop minus signs, add, divide by number of periods
- MSE: square each error, add, divide
- MAPE: |error| ÷ actual × 100 for each, add, divide
- Port example (α = 0.1): MAD 10.31, MSE 190.82, MAPE 5.59%
Possible extras: trend smoothing, seasonal index, regression, tracking signal
Capacity
Three capacities, two ratios
Design = the most possible in a perfect world. Effective = the most possible after normal breaks, cleaning and maintenance. Actual = what really came out.
Utilisation = Actual ÷ Design × 100 Efficiency = Actual ÷ Effective × 100- Find the three numbers: design 100, effective 80, actual 64
- Utilisation = 64 ÷ 100 = 64%
- Efficiency = 64 ÷ 80 = 80%
- Check: efficiency is always the bigger one
Worked: cars and pumps (slides)
Break-even: where revenue meets cost
Each unit sold leaves (price − variable cost) to pay the fixed cost. Break-even = how many units it takes to pay it all.
- Fixed cost F = 20,000 (rent), price P = 3, variable cost V = 1
- Each unit leaves 3 − 1 = 2 towards rent
- Units needed = 20,000 ÷ 2 = 10,000 units
Make or buy
| Make | Buy | |
|---|---|---|
| Cost at 1,000 units | 20,000 + 10 × 1,000 = AED 30,000 | 27 × 1,000 = AED 27,000 ✓ |
| Switch point | 20,000 ÷ (27 − 10) = 1,177 units; above it, make | |
Make = pay fixed cost + your cost per unit. Buy = pay the supplier price per unit. Pick the cheaper total.
Make cost = F + V × N Buy cost = Price × N- Make: 20,000 + 10 × 1,000 = AED 30,000
- Buy: 27 × 1,000 = AED 27,000
- Buy is cheaper at 1,000 units
Bottleneck: the slowest step sets the pace
Machines needed
What lowers effective capacity
LayoutSkillsQualityShifts policySchedulingSupplyRegulations
Total hours of work ÷ hours one machine can give in a year. Always round up, you cannot buy part of a machine.
Machines = Hours needed ÷ Hours per machine, round up- Hours needed = 5,800
- One machine: 250 days × 8 h = 2,000 h
- 5,800 ÷ 2,000 = 2.9 → 3 machines
Aggregate planning
| Strategy | How | Main cost |
|---|---|---|
| Level | Same output every month; stock absorbs swings | Holding inventory |
| Chase | Output = demand; hire and fire every month | Hiring + layoff |
| Mixed | Mix: steady core + subcontract or overtime | Subcontract / overtime |
Level: make the same amount each month; extra goes into stock, so you pay holding cost. Chase: make exactly what is demanded each month; you pay to hire and lay off.
Level cost = total stock carried × holding cost Chase cost = hires × hire cost + layoffs × layoff cost- Level: output per month = total demand ÷ number of months
- Chase: workers each month = demand ÷ output per worker (round up)
- Compare the two totals. The smaller one is the better plan
Same demand, three plans (roofing supplier, units per month)
Worked: roofing plans and Example 5
Chase recipe (bank Q3)
| Step | Do |
|---|---|
| 1 | Output per worker per month (Al Saleem: 2 × working days) |
| 2 | Month 1 need = demand − opening stock; later months = demand |
| 3 | Workers = need ÷ output per worker, round up |
| 4 | Up from last month → hire · down → lay off |
| 5 | Hires × hire cost + layoffs × layoff cost |
Do this for every month, then add up.
Workers needed = (Demand − Opening stock) ÷ (Output per worker per day × Working days), round up- Output per worker in April = 2 sets × 21 days = 42
- April need = 3,400 − 700 opening stock = 2,700
- Workers = 2,700 ÷ 42 = 64.29 → 65
- We have 60, so hire 5 → 5 × $300 = $1,500
- Repeat each month (no opening stock after April). Total = $27,400
Worked: Al Saleem ($27,400) and NPI ($22,400)
Capacity options (react)
InventoryHire / lay offOvertimePart-timeSubcontract
Demand options (influence)
Price / promotionBackordersCounter-seasonal products
Scheduling
| Term | Formula |
|---|---|
| Flow time | running total of processing times |
| Mean flow time | Σ flow ÷ n |
| Tardiness | max(0, finish − due) |
| Makespan | time to finish all jobs |
One machine: pick a rule
| Rule | Order by | Best for |
|---|---|---|
| FCFS | arrival | fairness |
| SPT | shortest job first | lowest mean flow time |
| EDD | earliest due date | lateness |
| LPT | longest job first | rarely best |
Put jobs in order by a rule, then see when each finishes and how late it is. EDD = earliest due date first. SPT = shortest job first.
Flow time = running total of job times · Tardiness = Flow time − Due (0 if negative) · Mean = Total ÷ Number of jobs- Sort jobs by the rule (EDD: by due time; SPT: by job time)
- Flow time: keep adding job times. TV2 10 h → 10, then TV1 7 h → 17…
- Tardiness: flow − due. TV1: 17 − 15 = 2 h late. If negative, write 0
- Mean flow time = sum of flow times ÷ jobs. Average tardiness = sum of tardiness ÷ jobs
Worked: TV shop (EDD) and garage (SPT)
Two machines: Johnson's rule
Two machines in a row (lathe, then grinder). Find the job order that finishes everything soonest.
Smallest time on Machine 1 → goes as early as possible · smallest on Machine 2 → as late as possible- List all times. Find the single smallest number in the table
- If it is on Machine 1, put that job in the first free slot. If on Machine 2, the last free slot
- Cross that job out. Repeat until all are placed
- Bank set 1: smallest is C = 9 on M2 → C goes last; then D = 12 on M1 → D goes first…
- Draw the timeline: Machine 2 starts a job only when Machine 1 has finished it. Last finish = minimum total time
Worked: both bank sets step by step
Tricky true/false
| Statement | Why | |
|---|---|---|
| Least idle time always gives least total time | F | "always": bad order can still waste time |
| Job order affects waiting and completion time | T | see the chart above |
| Machine fully busy but jobs late | T | TV shop: busy all along, 7 of 8 late |
5-mark case answers
| Case | Levers (action → effect) | Result |
|---|---|---|
| Factory costs, breakdowns, late | Preventive maintenance → less downtime Planning + sequencing → on-time delivery Lean → less scrap and waiting Inventory control → lower holding cost | Lower cost per unit, higher productivity |
| Hospital waits, shortages | Capacity matched to arrivals Rosters built on demand Reorder points for medicine Online booking, e-records | Shorter waits, happier patients |
| Defects competition, complaints | Process mapping, root cause Automation (CNC, robots) SPC charts, TQM Operator training | Fewer defects, more competitive |
Interactive solvers
Type any numbers from a past paper or the mock and the page shows each step. Use them to check your own working, not to replace it; the exam wants the table on paper.
Least squares
Chase strategy
Johnson's rule
Priority rules (FCFS, SPT, EDD, LPT)
Forecast methods and errors (MA, weighted MA, exponential smoothing)
Capacity and break-even
Level against chase (workers per period)
Recall drills
Tap a card to see the answer. Say the answer out loud before you tap. Go through the deck three times; on the third pass you should not need to tap.
Mock exam: 60 minutes, 30 marks
Built from the bank's layout and the topics the teaching plan and slides add. The real paper will be shorter. Part E has one question for every topic that could fill the blank Q4, so treat E2 to E4 as a choice of two if you are short of time.
Part A: multiple choice (1 mark each)
- Which of these is an input to a transformation process? (a) Customer satisfaction (b) Raw material (c) Finished car (d) Profit
- A firm makes 900 units with 150 labour hours. Labour productivity is (a) 0.17 (b) 6 (c) 750 (d) 1,050 units per hour
- Aggregate planning normally covers (a) 1 to 7 days (b) 3 to 18 months (c) 5 to 10 years (d) one shift
- Utilisation is actual output divided by (a) effective capacity (b) design capacity (c) demand (d) inventory
- Which error measure is expressed as a percentage? (a) MAD (b) MSE (c) RMSE (d) MAPE
- Which rule gives the lowest mean flow time on a single machine? (a) FCFS (b) EDD (c) SPT (d) LPT
Part B: fill in the blanks (1 mark each)
- The Delphi method is a __________ forecasting technique.
- In exponential smoothing, α is called the __________ constant.
- The operation with the lowest capacity in a sequence is the __________.
- Under a chase strategy the main costs are hiring and __________.
- Tardiness is never __________.
Part C: true or false (1 mark each)
- On a single machine, changing the job order changes the makespan.
- Efficiency can never be lower than utilisation for the same output.
- A larger n in a moving average makes the forecast react faster to change.
- Opening inventory reduces the production needed in the first month of a chase plan.
Part D: short case (5 marks)
A restaurant chain has long queues at lunch, food waste at night, and staff who are idle in the afternoon. Explain how capacity, workforce scheduling, inventory and technology decisions can fix this.
Part E: numericals
E1. Daily demand for a coffee kiosk over seven days was 98, 110, 131, 140, 162, 175, 190. Derive the least-squares linear forecast equation and forecast day 8.
E2. Monthly demand was 120, 132, 128, 141, 150, 146. For months 4 to 6, compare a 3-month moving average with exponential smoothing (α = 0.3, forecast for month 1 = 118) using MAD and MSE. Which method is better?
E3. A bottling line has a design capacity of 1,200 bottles a shift and an effective capacity of 1,000. Last shift it filled 850. Find utilisation and efficiency. A new product has fixed cost AED 45,000, price AED 12 and variable cost AED 7 per unit: find the break-even volume.
E4. Quarterly demand is 60,000, 90,000, 150,000 and 100,000 units. One worker makes 1,000 units a quarter and the firm starts with 100 workers. Hiring costs $200, firing $400, and holding $0.40 per unit per quarter. Compare a level plan with a chase plan.
E5. Six jobs pass through machine 1 then machine 2 (hours). P: 8, 6. Q: 5, 10. R: 12, 3. S: 4, 11. T: 9, 8. U: 7, 9. Find the Johnson sequence and the minimum total time.
E6. Six jobs A to F have processing times 6, 2, 8, 3, 9, 4 days and due dates 10, 6, 18, 8, 25, 12. Compare FCFS, SPT and EDD on mean flow time and average tardiness.
Show answers
Answer key
A: 1 (b), 2 (b) 900/150 = 6, 3 (b), 4 (b), 5 (d), 6 (c).
B: 1 qualitative, 2 smoothing, 3 bottleneck, 4 layoff (firing), 5 negative.
C: 1 False, the machine runs all jobs back to back whatever the order. 2 True, effective capacity is never above design capacity, so dividing by it gives the larger percentage. 3 False, a larger n smooths more and reacts more slowly. 4 True.
D: Use the hospital frame: capacity (more counters and tables at lunch), workforce (split shifts, fewer staff mid-afternoon), inventory (forecast-based prep, smaller evening batches, first-in-first-out), technology (online pre-orders, kitchen display, sales data to forecast). Close on shorter queues, less waste, lower labour cost.
One-page cheat sheet